Suppliers on OpenEik: propose the real product, in the model.

How a building-product supplier works on a project the way an open-source contributor works on a code base: invited in, working in its own copy, checking with its own tools, and proposing the parts it will actually make, with a quote, for the client to review in the model.

The worked example is railings on balconies. The same pattern applies to every building part and every supplier. All names, versions and amounts on this page are synthetic. OpenEik is an open, non-profit, vendor-neutral standard: this page describes an open pattern that any supplier and any host can follow.

01 The problem today

Today a supplier prices its own reading of someone else's drawings.

It gets PDFs

Plans, sections and a railing schedule, exported from the design model. The model itself, if it is shared at all, is a one-off export.

It re-draws and quotes on its interpretation

The supplier re-draws the railings in its own tool to work out what it can make, then prices that. The client never sees the re-drawn version in the model.

Deviations are found late

A post in another place, a lower height, a corner the system cannot make: these surface at shop drawings or on site, not when the quote is accepted.

Quote and drawing drift apart

The design keeps changing after the quote. Nothing says which drawing a price was for, or that it no longer fits.

Comparing suppliers means comparing PDFs

Each bid describes a slightly different product in its own format. Checking them against the building is manual work.

What is missing is one shared, versioned place where the supplier's real product sits in the model, next to the design it replaces, with the price tied to it.

02 The code analogy

A supplier on a project works like a contributor on a code base.

Open-source contributorSupplier on OpenEikRailing example (synthetic)
Invited to a repositoryInvited to a project, with a supplier roleSupplier A reads the whole model, as it gets a complete IFC today
Forks the repositoryWorks in its own copy, in its own organisation; writes only therea fork of the project at version 4f8e2a6b
Changes the codeReplaces the designed parts with parts it can make12 designed railings become Supplier A's railings
CI runs the testsIts own tool checks manufacturabilitygreen, yellow or red per railing, with deviations
Opens a pull requestOpens a proposal: the parts, a diff against the design, and a quotetyped commands for the railings, plus the quote as an attachment
Review and mergeThe client reviews in 3D and acceptsthe client merges Supplier A's proposal

The building is stored as a code base: one record per file, versions, diffs, merges and typed commands. So the contributor's workflow carries over almost unchanged.

03 The flow · seven steps · synthetic example

From invitation to order, the model holds what will be made.

CLIENT architect or contractor PROJECT · MAIN the model, protected SUPPLIER A its own organisation 4f8e2a6b a named version 7c1d93e0 what will be made Invite with a supplier role reads the whole model by default Read 4f8e2a6b, find every railing category: railing Work in its fork replace the designed railings Check with its own tool R-1 R-2 R-3 Proposal commands + quote Review diff, check and quote in 3D, then merge one proposal Order tied to 7c1d93e0 Stays in the fork: article numbers, costing, its own design data 1 2 3 4 5 6 7
  1. Invite as a supplier: it reads the whole model and writes only to its fork.
  2. Read a named version; find every railing by category.
  3. Work in its own fork.
  4. Check with its own tool: green, yellow or red, with deviations.
  5. Open a proposal: typed commands for the changed elements, plus the quote.
  6. The client reviews diff, check and quote together, and merges one.
  7. The model holds what will be made; the order is tied to that version.

By default a supplier reads the whole model, as it gets a complete IFC today; the client may narrow it to some parts. It writes only to its own line of work, a fork or an alternative.

04 The diff · Supplier A on balcony B2 · synthetic example

The diff is the deviation report.

R-1
ManufacturablePosts 200 mm in from the corners; the design had them at the corners.
R-2
Very closeHeight 1070 instead of 1100, the system's standard height. Side-mounted on the slab edge.
R-3
Not manufacturable as drawnThe corner is outside the system's range. Alternative proposed: two runs with a shared corner post.

Every railing is one record in one file, so a host can show the change per railing and per field, in 3D and as text. Nothing has to be re-typed into a deviation list: the list is the diff, and the check status sits beside it.

architecture/level-2/railing/railing-r2h6tq9c.json · 4f8e2a6b → proposal {
   "category": "railing",
-  "height": 1100,
+  "height": 1070,
   "hostId": "slab-b2",
   "id": "railing-r2h6tq9c",
   "mark": "R-2",
   "railing": {
     "edges": ["slab-b2:edge:3", "slab-b2:edge:0", "slab-b2:edge:1"],
-    "inset": 50
+    "inset": -25,
+    "posts": {"at": [200, 1350, 2500, 3650, 4800]}
   },
-  "typeId": "type-railing-design-1100"
+  "typeId": "type-railing-supa-s1070"
 }
+ types/architecture/railing/type-railing-supa-s1070.json   new type
~ railing-r1… railing-r3… and 9 more                       12 railings

A negative inset puts the line outside the slab edge, as for side mounting. posts.at (post positions along the line, in mm) is not in 0.1: it is one of the railing additions planned for 0.2 (see the first pilot).

05 The quote · tied to a version · synthetic example

The quote is tied to the exact version it priced.

quote.json · an attachment on Supplier A's proposal{
  "supplier": "Supplier A",
  "pricedVersion": "4f8e2a6b…",
  "inputs": {"count": 27, "digest": "b71c09e4…"},
  "lines": [
    {"marks": ["R-1", "R-4", "R-5", "…"], "type": "type-railing-supa-s1100"},
    {"marks": ["R-2", "R-7"], "type": "type-railing-supa-s1070"},
    {"marks": ["R-3"], "type": "type-railing-supa-s1100", "note": "alternative"}
  ],
  "total": {"amount": 486000, "currency": "SEK"},
  "validUntil": "…"
}
4f8e2a6b priced 9b3c51d7 B2 front edge moved c20e7f4a re-priced quote current out of date new changed since priced: slab-b2, railing-r2h6tq9c
The same mechanism as analysis results. The quote names the version and a digest of the records it priced. Hash those records at the head and compare: if one changed, the quote is out of date, and the host can say which records changed. Computed, never typed in by hand.

Version tie and staleness are those of result manifests (computedFrom, inputs digest; see Apps). The openeik tools already compute stale results and name the changed records (in testing). The quote attachment and its format are planned. Amounts illustrative.

06 A tender in the model · synthetic example

Competing proposals against the same version make a tender inside the model.

4f8e2a6b 7c1d93e0 · merged Supplier A · side mount 12 railings, check, quote Supplier B · top mount 12 railings, check, quote × closed Both read the same version, so their railings, checks and quotes compare directly. Neither sees the other's proposal.
ProposalMountCheck, 12 railingsMain deviations from the designQuoteOutcome
Supplier Aside, on the slab edge921posts 200 mm in from the corners; R-2 and R-7 at 1070 instead of 1100; R-3 as two runs486 000 SEKmerged
Supplier Btop, on the slab1011posts 150 mm in from the slab edge; R-3 with an added corner post452 000 SEKclosed

The client compares the actual railings in 3D, their checks and their prices side by side. Merging one proposal makes it the model; the others are closed and stay in the record of the tender.

Hidden from each other. During a tender a supplier never sees another supplier's proposal, diff, checks or quote. Only the client, the project's owners, and each supplier's own organisation see a proposal.

Suppliers, amounts and deviations are synthetic.

07 Level of detail · the supplier's choice

A proposal can carry any level of detail. The supplier decides where it sits.

less detailthe supplier chooses, per proposalmore detail
Interface only · the safe minimumEnvelope, fixings, clearances, positions, tolerancesExact enough for perfect geometric checks and layout control. Nothing about how the part is made.
Interface and productPlus the visible productInfill, rails and finish as they will look, for review and rendering.
Product modelPlus the main partsPosts, rails and panels as separate parts, still without fabrication data.
Full manufacturing modelEverything, if it wantsInternal profiles, joints, machining and cutting data. Allowed, never required.

The interface, at the minimum, is precise

  • the exact outer envelope of each part;
  • fixing and connection points, and post and fixing positions;
  • clearances and access zones;
  • loads on the structure;
  • declared tolerances.

One way to see the minimum: publish the header file, not the source, the interface others build against without the implementation. It is one point on the scale, not the rule. A supplier can share its whole design.

Every record says what it is

a sketch: not in 0.1, proposed for 0.2"detail": {
  "level": "interface",
  "authoritativeFor": ["envelope", "fixings", "clearances",
                       "positions", "loads"],
  "notFor": ["fabrication"],
  "tolerances": {"envelope": 3, "positions": 2}
}

Checks then know what they may rely on: a clash or layout check reads the envelope and positions; nobody mistakes an interface record for shop drawings.

Records at a declared level of detail are planned for OpenEik 0.2; the declaration above is a sketch, not in 0.1. A related industry concept is the level of information need, ISO 7817-1:2024, “Building information modelling — Level of information need — Part 1: Concepts and principles”, adopted in Europe as EN ISO 7817-1:2024, which replaced EN 17412-1:2020. That standard lets a client specify the information needed for a purpose; the declaration here lets a record state what it provides. Tolerance values in mm, illustrative.

08 Level of detail · one railing, two levels · synthetic example

The same railing at two levels. Here the supplier chose interface only.

INTERFACE · WHAT THE PROJECT GETS precise enough for exact geometric and layout checks 200 1070 post positions envelope ± declared tolerance slab-b2, front edge access zone for fixing fixing FULL DETAIL · OPTIONAL shared only if the supplier chooses post profile: walls, chambers mitre joint, rivet holes CUT LIST A-•••• post 1 270 90° A-•••• rail 3 560 45° A-•••• rail 1 480 45° A-•••• spindle 960 — … profiles and joints, machining and cutting data, article numbers Project model · main goes in, declaring level "interface" Supplier A's fork stays here in this example

The left side is enough for the client to check every railing against the slab edges, doors and drainage, and to lay out the fixings. Whether the right side also goes in is the supplier's decision, per proposal.

09 Secrets and IP

What the supplier does not share stays with the supplier.

PROJECT · CLIENT'S ORGANISATION the model's shared history railing types and elements at the declared level of detail the diff and the check results per railing, tied to the version product identity, if chosen system and finish; never article numbers SUPPLIER A'S FORK · ITS OWN ORGANISATION and its own folder in that fork supplier-a/ ├── articles/article numbers ├── costing/costs and margins ├── design/its full product model └── cut-lists/manufacturing data Not part of the proposal, so never merged. Proposal commands only Quote client and Supplier A only; not in the model's history

Kept in its own fork

Article numbers, costing and its own design data live in the supplier's fork and folder, in its own organisation.

Sent to the project

Only the building parts at the level of detail it declared, and the quote. Product identity such as system and finish only if it chooses.

Private to the client and that supplier

The quote is an attachment on the proposal, not part of the model's shared history. In a tender, no supplier sees another's proposal, diff, checks or quote.

10 After the merge

After the merge, what is ordered is what is drawn.

7c1d93e0 · ordered order tied to this version a2f4e118 balcony B3 widened head diff against the ordered version: railing R-5 changed

The model is true

The railings in the model are the ones that will be made, at the declared level of detail.

The order names the version

The order points at the merged version, so everyone knows exactly which railings it covers.

Design responsibility is recorded

The proposal, its author and the merge are in the history. Signing the supplier's design responsibility for those records is planned with a host: the host's signature first, personal electronic signatures later.

Later changes are diffs

If the design moves on, the change shows as a diff against what was ordered, per railing, not as a surprise on site.

11 Every building part · every supplier

The same pattern for every building part.

PartThe supplier's checkThe interface it sharesIn the standard today (0.1)
Railingssystem rules, mount, postsenvelope, posts, fixings, loadsa railing category, with a type payload for its kind, height, posts and rails; richer railing types planned for 0.2
Windows and doorssizes, opening, hardwareframe envelope, fixings, opening clearanceswindow and door categories with types, hosted in walls
Roof trussesspan, bearing, loadstruss envelopes, bearing points, loads on wallstruss layouts, which a command turns into members; the truss rules are reference behaviour
Steel framesmembers and connectionsmember envelopes, connection points, bolt accessbeams and columns with sections; plates, bolts and welds as components; fabricated pieces and structural joints
Precast elementsproduction and liftingelement envelope, lifting and connection points, jointsa type's layer can be precast (hollow-core or plate units); fabricated precast pieces; the precast rules are reference behaviour
Building servicesrouting, fittings, equipmentequipment envelope, connections, service clearancespipe, duct and terminal categories; fittings are reference behaviour
Liftsshaft, pit, headroomcar and shaft envelope, loads on the shaftno lift category; a shaft's type can have the purpose “lift”

Invite, fork, check, propose with a quote, review, merge: the flow is the same. What differs is how rich each part's type data is in the standard, which decides how much of a supplier's product can be expressed as typed records.

12 The first pilot · a railing manufacturer · synthetic, anonymous

The first pilot: a railing manufacturer. Today's railing category works; it needs a 0.2 addition.

Works today. A supplier-style railing type and a railing on three edges of a balcony slab passed a dry run and a real run with today's reference implementation. The model validated and the checker found no errors. No new record kind was needed.
Follows the building. Moving the balcony's front edge made the reference implementation rewrite the railing, and the openeik tools reported the supplier's result set as stale, naming both changed records.
Tools disagree on posts. Same post count, different positions: the reference implementation puts posts at the corners, the supplier's engine 200 mm in from them. Explicit positions in the record settle it.

The supplier's data went into the type's product identity and a material. Its own rules stay in its own tool; only their result, such as post positions, goes into the record.

Planned for 0.2, all optional

railing type"railing": {
  "kind": "balusters", "height": 1150, "…": "…",
  "mount": "side",
  "postWidth": 30, "postDepth": 50,
  "postEndDistance": 200
}
railing element"railing": {
  "edges": ["slab-b2:edge:3", "slab-b2:edge:0", "slab-b2:edge:1"],
  "inset": -25,
  "posts": {"at": [200, 1308, 1525, 2633, 3525, 4642]}
}
  • Mount: side (on the slab edge) or top.
  • Rectangular posts: width and depth, not one square size.
  • Explicit post positions, in mm along the line, so tools agree.

From a test on 11 October 2026 with one railing manufacturer's configurator, the reference implementation's engine and the openeik tools, on a copy of an example house with a balcony added. Values in the snippets are illustrative. The railing additions are on the roadmap as Next (0.2).

13 Today and next · 11 October 2026

What is live today, and what comes next.

Live

  • OpenEik folders and the reference implementation's ek engine.
  • Kept app folders: files an app writes in its own folder are kept through save, restore and merge.
  • Versions, with a hosting service if a project's owner chooses.
  • The openeik reader and checker tools: in testing, public with the specification in Q4 2026. They already compute stale results and name the changed records.

Planned for OpenEik 0.2

  • Records at a declared level of detail, saying what they are authoritative for.
  • The railing additions: mount, rectangular posts, post positions.

Planned with a hosting service

  • Forks across organisations.
  • Proposals, the pull requests of this page.
  • Checks before merge.
  • Quote attachments on proposals.
  • Optional narrowed read access, set by the client. By default a supplier reads the whole model.
  • Competing proposals hidden from each other during a tender.

Host features, not part of the standard: any host can offer them.

So the flow above is a target. The pieces it rests on, versions, typed commands, records that follow the building and results that know when they are stale, exist today.

14 Who does what

The standard defines the records. A host runs the workflow.

OpenEik · the open, non-profit standard

  • The records: one building part per file, with types and their payloads.
  • The level-of-detail declaration: what a record provides and what it is authoritative for (planned for 0.2).
  • Typed commands: how a proposal changes the model.
  • Versions: how a quote or a result names what it was made from.
  • Vendor-neutral: any host, or a plain folder and git, can implement the flow.

A host · any hosting service

  • Proposals between organisations, with review and merge.
  • Attachments such as quotes, visible to the right parties.
  • Supplier access: the whole model by default, optionally narrowed by the client; competing proposals hidden from each other.
  • Checks before merge.
  • A marketplace where suppliers propose against projects.

The two roles are separate on purpose. A supplier's railings are OpenEik records wherever they are hosted; a host is one place to run the proposal flow, not the only one.

In one line

Invite. Read a version. Work in a fork. Check. Propose the real product, with a quote. Review it in the model. Merge.

The supplier decides how much detail it shares. The client sees exactly what it is buying, against exactly the version it was priced for.

A supplier is one more app on the model: the same pattern as structural analysis, a schedule or a daylight study.